Week 12 Update: Frontend-Backend Compatibility Breakthrough

Progress Summary

This week, the team achieved a critical breakthrough in frontend-backend compatibility for the graduate applicant rejection feature. By leveraging existing system patterns documented in §API Documentation/Endpoints and §Database Data Dictionary, we implemented a streamlined solution that aligns with the client’s requirements while avoiding unnecessary complexity.

Key Technical Adjustments

1. Frontend Modification

  • Swapped POST /api/applications/{id}/reject with POST /api/applications/{id}/close endpoint (§API Documentation §5.2)
  • Removed rejection reason input field to match the close endpoint’s parameters
  • Updated UI button logic in FormButtons.vue (§Frontend Components):

2. Backend Validation

  • Confirmed status_id updates correctly via the close endpoint (§Database Entity Relationship Diagram)
  • Retired unused rejected_at and rejection_reason columns from previous implementation

3. Database Sync

  • Verified status_id transitions using DBeaver (§VII Database)

Sprint Backlog List

TaskStatusOwnerDocumentation Reference
Modify frontend to use /close endpointCompletedCastro§API Documentation
Remove rejection reason input UICompletedCastro§Frontend Components/Dialog
Update backend close endpoint policy checksIn ProgressQuidet§Backend Application/Policies
Validate status_id persistenceCompletedDomingo§Database Data Dictionary
Prepare client demo scenariosPendingDomingo§Technical Documentation/Versioning
Update API documentation for /close usagePendingQuidet§API Documentation
Conduct cross-browser compatibility testingNot StartedDomingo§Kubernetes Deployment/Testing

Client Presentation Plan

Demo Focus Areas

  • Show status_id updates in real-time via DBeaver (§VII Database)
  • Demonstrate admin workflow using the modified button (§Frontend Components)
  • Highlight reduced development time by reusing existing endpoints (§System Architecture)
This solution adheres to the original project constraints while utilizing documented patterns from §API Documentation and §Frontend-Backend Integration. The team is now positioned nearing finalizing documentation and can currently proceed with client evaluation.